For decades architects, engineers and contractors have speculated about how the healthcare building process can be improved. Pre-fabrication offers dramatic opportunities for construction process improvement and quality control. What are the right applications for pre-fabrication in healthcare and what factors should be considered at the start of design?

Ballinger Principals Louis Meilink, Jr., AIA, ACHA, ACHE and Barry Finkelstein, PE and Healthcare Planner Christina Grimes, AIA, LEED AP BD+C, EDAC, along with Richard Lanzarone, a Project Executive at Turner Construction Co., explored these questions at the 2017 PDC Summit in Orlando, an annual international conference on health facility planning, design and construction. Their presentation “The Whole Box: Beyond Pre-Fabrication,” illustrated the spectrum of pre-fabrication possibilities, from components to structural modules, and outlined a process to help clients determine if a project, or part of a project, is right for pre-fabrication.

Link to Presentation